colossal TPMK details for the Krasnoyarsk metro tunnel delivered to the excavation site
💥 Krasnoyarsk Metro's Tunnel Anastasia Arrives 💥
The work on the construction of Krasnoyarsk's metro tunnel - the one named Anastasia - is well underway on Ploshchad Revolutsiya. The massive parts of the Tunnel Boring Machine (TBM) were delivered to the mounting excavation pit, as showcased by the official Metrotram TG channel.
🎥 Watch the nighttime delivery and unloading video, courtesy of "Bamtonnelstrui-Most", the construction contractor of the metro.
The primary components of the TPMC Anastasia have arrived at the future Ploshchad Revolutsiya station: these include the technical carriages, a rear shield to support the tunnel walls during excavation, tunnel locomotives, and a rotor, which, by digging underground, takes a bite out of the ground.
They transported the heavy machinery at night: the video demonstrates the loading of the disassembled shield onto trucks and the transportation along Bryanskaya and other streets.
- The massive parts of the Tunnel Boring Machine (TBM) named Anastasia, essential for the Krasnoyarsk metro tunnel construction, have arrived at the mounting excavation pit located on Ploshchad Revolutsiya.
- The primary components of TPMC Anastasia, such as technical carriages, a rear shield, tunnel locomotives, and a rotor, have arrived at the future Ploshchad Revolutsiya station.
- The metro news covers the delivery of the key components of TPMC Anastasia, which includes a rotor that digs underground, resembling a bite out of the ground.
- In a main headline, Lifestyle and Home-and-Garden sections might feature the announcement of the arrival of the Anastasia TPMC parts at the Ploshchad Revolutsiya station as a major development in the construction of Krasnoyarsk's metro tunnel.